← KƎƎLO™Urbyte™ ↗

Evidence library

Controlled Proofs & Public Submissions

Technical evidence for the Executive Operating System for governed delegated execution, and for Urbyte™ allocation-waste verification. Reports retain their original test scope and maturity classification.

Capability ≠ Authority. Controlled proof results are not claims of production certification or universal security. Redacted reports may contain both completed results and future specifications.

Redacted test and assurance documents

Keelo Quantum Simulation Defensible Test Report

9 October 2026

QGP-01-QUANTUM-SIMULATION · 40/40 normal cases passed. Withdrawn permission 0/32 effects. Eight permitted requests executed once each. Forty completed fresh-process replays made zero connector calls. One deliberate bypass effect detected outside normal cases.

Completed controlled simulation; not evidence of operation on a quantum computer.

Read redacted PDF ↗

KEELO Rogue Fleet Defensible Proof Results

17 September 2026

KEELO-ROGUE-FLEET-001 · 10,000 synthetic agents. 100,000 commands. 10,000 authorised effective executions. Zero unauthorised or duplicate effective executions. Complete reconciliation. Three forced interruptions recovered. All ten defined integrity attacks detected. Deterministic reproduction MATCH.

Completed controlled proof and deterministic reproduction.

Read redacted PDF ↗

Urbyte and Keelo Enterprise Fleet Runs

18 September 2026

1,000 / 5,000 services · 79,087.919 / 266,750.6 GB verified unused allocation. 770 / 3,485 controlled executions and external receipts. Zero duplicates and unresolved obligations in both runs.

Controlled synthetic enterprise fleet proof results.

Read redacted PDF ↗

Data Centre Allocation Waste

18 September 2026

5,000 assets over 84 days. 420,000 raw daily rows. 4,323 verified assets. 1,157 controlled executions, durable receipts and verified outcomes. Zero duplicates and unresolved obligations.

Detailed controlled data-centre proof.

Read redacted PDF ↗

Data Centre Allocation Waste Controlled Proof Results

Companion summary of the same 5,000-asset proof. Dates and detailed scope remain in the linked source documents.

Companion results report; not an additional independent run.

Read redacted PDF ↗

KEELO-NO-MEANS-NO-001 Separate-Route Denial Enforcement Proof

29 September 2026

Nine materially distinct runtime routes. 10,000 synthetic identities. 100,000 attempts. 90,000 prohibited commands denied. 10,000 authorised effective executions. Zero unauthorised effects, duplicate effects and route-substitution bypasses. Exact recovery after forced runtime interruption.

Controlled separate-route denial enforcement proof.

Read redacted PDF ↗

Keelo + Urbyte Controlled Execution Evidence Appendix

12 September 2026 · Version 2.0

Supporting annex to the 1,000-service proof. Not a separate independent proof.

Supporting technical appendix to the 1,000-service controlled proof.

Read redacted PDF ↗

Revoked Authority Before Execution

Evidenced/Current plus Next Proving Work. The report distinguishes authority-revocation handling and obligation retention from the broader standalone before-execution assurance sequence. The later quantum report covers its own narrower control family.

Current evidence and remaining proving work are distinguished in the report.

Read redacted PDF ↗

Keelo Rogue Fleet Autonomous Governance Stress Test

Historical specification. Its NOT YET EXECUTED status belongs to that source record; completed results appear in the separately dated proof above.

Historical plan, not a second completed proof.

Read redacted PDF ↗

KEELO-PG-MOB-01 ENTERPRISE MOBILITY TRIAL

17 August 2026

Historical predetermined synthetic working trial. Not real-world data.

Historical predetermined synthetic trial material.

Read redacted PDF ↗

Public submissions

Submission 48 — Joint Select Committee on Artificial Intelligence

Urbyte Pty Ltd submission dated 12 September 2026, including the 1,000-service controlled technical annex. Addresses governance requirements for AI-enabled operational decisions and execution. A public parliamentary submission, not a parliamentary finding, endorsement or certification.

Read Submission 48 ↗

Australian Government consultation — record of submission

Record dated 9 October 2026 for the consultation “Getting it Right: Building AI Infrastructure That Works for Australia”. Themes include evidence-based accountability, verification before conclusions, governance before execution, traceable decisions, public benefit, proportionate regulation, energy, water, communities and national capability. The supplied record does not establish government approval, adoption or technical validation.

Read submission record ↗

Document register

Read the supplied redacted document register ↗

Reading the evidence

Evidenced/Current identifies completed controlled results. Next Proving Work identifies specified tests and production evidence still to establish. Destination Case describes intended wider application, not a verified deployment.

Exactly-once claims apply to the tested effective-execution contract and receiver observations, not universal distributed exactly-once semantics. Financial and emissions exposure estimates do not establish realised savings, emissions reductions or ISO 14001 certification.